Connecting to a sewer

顺丰游戏加速器2025

If you're planning to connect or reconnect to one of our sewers, you’ll need our consent before you go ahead. That’s because we need to check the connection will work as planned and that it won’t potentially cause problems such as sewer flooding or pollution. We have legal duties around this, set out in Section 94 of the Water Industry Act 1991 (‘the Act’).

Sewer connections can be made directly to a public sewer or indirectly to a private drain that in turn discharges to a public sewer. Whether your connection is direct, indirect, or if you're seeking to relocate an existing manhole, an application form must be completed.

You can either connect to a local sewer under Section 106 of the Act or in some circumstances to a trunk or chemical sewer under Section 107 of the Act. Connecting to trunk or chemical sewer can be complex and dangerous so we'll need to carry out this work for you.

If your proposals are covered by a planning application, no right of connection to a public sewer exists under the Water Industry Act 1991 until planning approval has been granted and any drainage conditions discharged. We'll therefore be unable to approve a sewer connection application made before planning is granted.

顺丰游戏加速器2025

顺丰游戏加速器2025

大航加速器mac下载,大航加速器7天试用,大航加速器2025,大航加速器vn  ikuuu安卓下载,ikuuu免费试用,ikuuu2025年,ikuuuvps  panda加速器下载地址,panda加速器打不开,panda加速器2025,panda加速器vp  逗鲨加速器pc版下载,逗鲨加速器跑路了,逗鲨加速器2025年,逗鲨加速器vqn  v2ray加速器官网破解版,v2ray加速器官网官网网址,v2ray加速器官网永久免费加速,v2ray加速器官网2025  嫖了么机场安卓下载,嫖了么机场vnp,嫖了么机场2025年,嫖了么机场vqn  跨境加速器下载地址,跨境加速器安卓下载,跨境加速器电脑版下载,跨境加速器2025年